Do you offer 3D floor plans?
Yes. 2D floor plans are our standard service and 3D floor plans are available [...]
Yes. 2D floor plans are our standard service and 3D floor plans are available [...]
The cost depends on the size of the property, the number of floors and [...]
We produce floor plans across Milton Keynes, Northampton, Towcester, Brackley, Daventry, Buckingham and the [...]
When we produce both at the same visit, the living area figures match. A [...]
Yes, we can produce floor plans for small commercial buildings such as shops and [...]
We measure carefully, but floor plans are for guidance only, as is normal practice [...]
Yes. We include integral and attached garages, conservatories and loft rooms used as living [...]
Someone needs to let us in, and we need access to every room that [...]
Existing EPCs remain valid for ten years from issue.
The four metric structure and the heating system cap come from a government consultation that closed in March 2026.
Not necessarily.
The launch was delayed from October 2026 to the second half of 2027.
Under the current proposals, no.
Not always, and not always safely.
However, Band D properties may need attention ahead of 2030, and the amount of work needed depends heavily on the SAP score within that band and
An EPC is the official certificate that gives your property's current energy rating.
Exemptions exist for certain situations.
Not necessarily. EPCs remain valid for 10 years from the date they're lodged.
Local authorities will be able to issue fines
Government has confirmed a single compliance date of 1st October 2030
HSE guidance allows a competent landlord to self-assess a simple system, but a professional assessment ensures compliant documentation.
Landlords, building owners, and businesses with domestic or light commercial water systems need a legionella risk assessment.
A legionella risk assessment should be reviewed every two years, or sooner if the water system or building use changes, per HSE ACOP L8 guidance.
An EPC assesses property energy efficiency and is legally required for sales or rentals.
EPC costs depend on property size and type.
EPC assessments take 45–90 minutes.
Landlords must provide an EPC when letting property.
Estate agents request floor plans to show property layout clearly.
Floor plans include dimensions, layout, and room placement.
Floor plans can be combined with EPC appointments.